Installing Your New Spa

Installing an above ground spa is a quick and easy process. You can have your spa up and running in as little as 1 day! Your Aqua Pulse Spa sales specialist will give you all the information you need to ensure a quick and uncomplicated installation of your spa. The installation process involves 4 key steps:

Delivery

On most occasions we can have your spa leaving our warehouse on the same day of placing your order.

Location

Finding the best location for your spa is important to get the most from it. Things to consider include:

  • Solid, flat and level foundations; the space it sits on must be able to support the weight of the spa, the water in it, and those who use it.

  • Rotating the spa to take advantage of a view.

  • Easy access to the service panels.

Installation

Now you have chosen the spas location and had the spa delivered you should fill the spa with water. 

Once filled with water you need an electrician to connect the power supply.

Chemicals

After the power is connect the spa is ready to add in the chemicals.  Your spa is now ready for you to enjoy.

Aqua Pulse Spas offer a full delivery and installation service plus a handover, to show you all the features and workings of your spa.  No job is too big or too small.

View our range of Fun and Therapy spas today! (link: http://aquapulsespas.com.au/spas.html)

Simply relax and unwind.

The Aqua Pulse Team